Install

Under Construction

What is the Quad Add-On?

Tools

  • T10 Screwdriver

  • T20 Screwdriver

  • Small Flat-Head Screwdriver

  • Philips-Head Screwdriver

  • Medium-size Pliers

  • Adjustable Wrench

    • Recommended: M6 Hexagonal Driver Bit (for bolts)

circle-info

Details, on when to use them, as shown throughout the install guide.

Additional Hardware

  • Super Glue

circle-info

Details, on when to use them, as shown throughout the install guide.

How To Install

Turn off Power

Unplug Power Supply

Remove Wall-E

circle-check

Remove Cable Chain

circle-check

Unfasten Gantry Belt Clamp

circle-check

Remove X Axis System

circle-check

Remove Extruder

circle-check

Prep Promega-Quad Adapter

circle-check

Install Promega-Quad Adapter

circle-info

Take the time to make sure your Promega-Quad Adapter slides smoothly.

circle-check

Prep Cable Chain

circle-check

Prep Duet Maestro

circle-info

Double check your electronics

circle-check

Install X Axis System

circle-check
circle-info

The holes used to fasten the X Axis System shown below:

Left Gantry Slider (symmetric for the right side)

Loosen Motors

circle-check

Install Belts

circle-info

Use a small Flat-head screwdriver to help with routing the belts through the idlers.

circle-check

Tighten Belts

circle-info

Double check your X Axis System is straight.

circle-check

Tighten Motors

circle-info

Double check your X Axis System is straight.

circle-check

Install Quad

circle-info

Use the small Flat-head screwdriver to move the M3 nuts to the correct position.

circle-check

Install Cable Chain

circle-check

Connect Quad

circle-check

Adjust Bed Limit Switch

circle-check

Check Wire Slack

circle-check

Plug-in Power Supply

Additional Electrical Changes

Jumpers need to be re-positioned.

Before:

After:

Fans need to be reconfigured.

Two Methods:

Change Fan Connections (Recommended)

Swap Crimps (Advanced)

triangle-exclamation

Proceed at own risk. Similar changes are done in-house by trained personnel for assembled Promega-Quads.

Plug In Motor Cables

Location of Motor Cable Connections on Board:

When plugging in motor cables, match the dots:

Left-side: Port 1, Right-side: Port 0
Left-side: Port 3, Right-side: Port 2
circle-exclamation

Additional Software Changes

Go to GitHubarrow-up-right

Download the Promega Source File.

Delete ALL content in SD Card.

Go to .../Downloads/promega-devel/Promega-devel/SD Card Structure/Quad.

Copy ALL and paste into SD Card.

Ready For Printing.

Last updated